Location
Lago Vista, Texas
Size
10,982 Sqft
Status
Under Construction
The second fire station that will be finalized in 2020 is Station #103. It was designed to accommodate 6 fire fighters with offices and a watch room. There are two pull through bays (with 1 back-in bay) with trench drains centered on each bay. Also located in the station is a Triage Treatment Room, Large Day Room with Dining Room, Large Kitchen (with 3 Separate Pantries with Storage & Refrigerator in Each), Laundry Room, 65 lb. Extractor, Washer Dryer, Turn Gear Dryers (with Room for 30), Large Workout Room, Rain Water Collection System for Irrigation and a Covered Outdoor Patio.